Hi everyone
I'm relatively new to this whole NI systems and I know fieldpoint is a bit outdated at the moment. I was trying to do a test setup which operates a relay (24V) at a specific interval for a specific time period. Eg: turn the relay ON for 10 mins in every 3 hours. Can I do this with a FP DO-401? I have a vi file which lets me set the time and interval and choose the fieldpoint location but im not sure if its working or not. Any help is appreciated. Thank you.